Port congestion is no longer an occasional nuisance—it is a persistent, high‑stakes challenge for global supply chains. As 2025 unfolds, shippers, logistics providers, and supply chain planners are grappling with prolonged vessel queues, terminal bottlenecks, and cascading delays.
In this environment, the uncertainty of timing can be as disruptive as cost overruns. To survive and thrive, organisations must plan for the unpredictable.
The Scale of the Problem in 2025
According to recent assessments, several of the world’s busiest ports are now routinely experiencing wait times of multiple days to more than a week before vessels can berth. Some ports are averaging delays of 6–10 days or more, especially where infrastructure, labor, and river access constraints converge. The result: many carriers are diverting calls or skipping ports altogether to maintain schedule integrity.
Moreover, congestion is no longer isolated to a few hotspots. In June 2025 alone, global delays reportedly surged by up to 300 %. At this level, nearly all major container hubs are under stress—vessels, equipment, and terminals are operating at or beyond capacity. The frequent misalignment of vessel arrivals leads to “bunching” (many ships arriving around the same time), which further stresses berthing slots and yard handling.
Read Also: Fluent Cargo launches “Ask Fluent”: The ChatGPT for live cargo logistics
Why Port Congestion Reaches Crisis Levels
Several factors conspire to make port delays endemic:
- Infrastructure and capacity limits: Many ports are running at or near full utilisation. When yard space fills, containers dwell longer, gates clog, and throughput slows.
- Labor issues and strikes: Workforce disruptions—crane operators, terminal staff, customs agents—can ripple through the entire port ecosystem, reducing operating hours or output.
- Weather, river levels & natural constraints: Low river depths (impacting barge connectivity), typhoons, storms, or other climate events can force closures or slow operations.
- Trade surges and imbalanced flows: When imports spike or export demand rises rapidly, ports can be overwhelmed—equipment, container repositioning, and hinterland transport struggle to catch up.
- Operational interdependencies: Delays upstream (at origin ports) or inland (rail, trucking, border) exacerbate port backlog. If containers or chassis aren’t returned in time, terminal logistics stall.
Strategic Impacts on Supply Chains
Delays at the port level ripple outward in many ways:
- Inventory and buffering costs: Companies often need to carry extra inventory or insert buffer times into schedules to absorb variation.
- Demurrage, detention & penalty fees: Containers held outside allowed windows incur daily charges, dramatically inflating logistics costs.
- Reliability loss: Unpredictable arrival times undermine Just‑in‑Time strategies, jeopardise customer commitments, and erode margins.
- Routing and reallocation complexity: Carriers may re‑route vessels via alternative ports or forego certain port calls, forcing shippers to adapt dynamically.
- Contractual and service risk: Service level agreements (SLAs) may break, incurring penalties or requiring renegotiation of terms.
Read Also: Building a closed-loop supply chain: Lessons from real-world implementations
Planning for the Unpredictable: Tactics & Best Practices
To manage this volatility, logistics and supply chain teams must adopt agility, resilience, and foresight:
- Add buffer time
Insert additional lead time (days or even weeks) into schedules to absorb potential port delays. - Alternate or secondary ports
Use less congested ports or inland gateways if feasible, even if transport cost is slightly higher. - Early booking & pre‑planning
Secure space and berthing slots well in advance. Avoid last-minute compression of volume. - Real‑time visibility & predictive analytics
Use AIS, port call data, congestion monitoring, and predictive models to anticipate backlogs and reroute proactively. - Flexible modal routing
Where possible, shift to intermodal transport (rail, barge) or hybrid ocean/air for sensitive cargo. - Container and asset repositioning management
Ensure empty containers and chassis are efficiently returned and staged to reduce dwell bottlenecks. - Robust contracts & contingency clauses
Include force majeure or delay allowances in contracts, and ensure alignment with carriers, 3PLs, and suppliers. - Invest in resilience
Over the long term, support port modernisation, terminal automation, labor training, and freight corridor upgrades.
Port congestion and shipping delays are unlikely to recede entirely—they are now structural challenges in many trade corridors. The real differentiator for firms will be their ability to design supply chains with slack, visibility, and flexibility. Those that treat unpredictability as a design parameter—rather than an exception—will be better positioned to mitigate disruptions, control costs, and maintain customer service even under pressure.
Cejay is a Content Producer for Supply Chain Channel, Australia's learning ecosystem created to fill the need for information, networking, case studies and empowerment for everyone in the supply chain sector.
- Cejay Domohttps://supplychainchannel.co/author/cejay-domoakolade-co/
- Cejay Domohttps://supplychainchannel.co/author/cejay-domoakolade-co/
- Cejay Domohttps://supplychainchannel.co/author/cejay-domoakolade-co/
- Cejay Domohttps://supplychainchannel.co/author/cejay-domoakolade-co/